Ostrołęka Power Plant

Ostrołęka C with 1000 MW capacity is a new coal-fired power plant to be built in Rzekuń in Mazowieckie Voivodeship. The power plant is going to be fuelled by hard coal with biomass. The project consists of power plant’s main objects, internal road system and railway system, power grid and water – sewage mains. Ostrołęka C is going to work independently on the Ostrołęka B power plant which has been functioning since 1972. According to the investor’s claims, building works are supposed to begin in 2018. Ostrołęka C is planned to start working in 2024. The cost of its building is estimated at 6 bn pln (approx. 1.4 bn Euro).